Nässjö-Värnamo 300 kV DC overhead line construction 33 km. Erection of towers, stringing works of conductors, shield wire and OPGW 2013-2014 Svenska Kraftnet
Hallsberg – Barkeryd 400 kV overhead line construction 40 km. Erection of towers, stringing works of conductors, shield wire and OPGW 2014 Svenska Kraftnet
Tikinmaa – Lavianvuori 2x110 kV overhead line construction 6,2km Tikinmaa-Lavianvuori 2x110 kV OHL: erection of towers, stringing works of conductors, shield wire and OPGW. 1,7 km reconstruction of Kangasala-Hikiä 400 kV OHL: erection of towers, stringing works of conductors, shield wire and OPGW. 2014 - 2015 Fingrid
Kristiinestad-Leväsjoki-Ulvila 400/110 kV overhead line 11 x 110 kV OHL connections to substation: stringing works of conductors, shield wires and OPGW 2014 Fingrid
Niitykummun SS – Olarinluoma 110 kV cable installation 9 x 110 kV cable and FOC installation 2014 Caruna
Ilmalantori 20 kV cable installation 27,8 km 20 kV cable installation 2014 - 2015 Caruna
L364 Eesti – Püssi 330 kV overhead line reconstruction Erection of 18 guyed towers, regulation of conductors, shield wire and OPGW 2015 Elering
Keiminmaa-Takakumpu 2x110 kV overhead line 4,5 km Keminmaa-Takakumpu 2x110 kV OHL: : erection of towers, stringing works of conductors, shield wires kaheahelalise 110 kV õhuliini ehitamine (mastide koostamine ja püstitamine, juhtmete, trossi ja OPGW montaaž 2015 Fingrid
Võru-Kanepi and Võru-Põlva 110 kV overhead line reconstruction Exchange of old insulator sets – 256 towers 2015 Elering
Tsirguliina-Valga 330 kV reconstruction 11 km. construction of tower foundations, erection of towers, stringing works of conductors and shield wires 2015-2016 Elering
Site: Description: When: Client:
220kV and 400 kV arrangements in Petäjäskoski substation Reconstruction of 4x 220 kV lines and 2x400 kV OHL: erection of towers, conductor-shield wire-OPGW stringing works 2016 Fingrid
Väike-Maarja – Rakvere 110 kV overhead line reconstruction Exchange of old insulator sets – 123 towers 2016 Elering
Taebla – Aulepa 110 kV overhead line reconstruction Exchange of old tower beams and insulator sets – 65 towers, stringing new conductors - 17 km 2016 Elering
Imavere-Koigi 110 kV overhead line reconstruction Exchange of old insulator sets – 50 towers 2016 Elering
Tartu-Elva 110 kV overhead line reconstruction Exchange of old insulator sets – 92 towers 2016 Elering
Maaritsa-Kanepi 110 kV overhead line reconstruction Exchange of old insulator sets – 92 towers 2016 Elering
110 kV and 330 kV overhead line reconstruction Exchange of 110 towers – 23 towers and one 330 kV tower, regulation of conductors, shield wire and OPGW 2016 Latvenergo
NA4 CHP 110 kV overhead line construction 1 km. Erection of towers, stringing works of conductors, shield wire and OPGW 2016 Destia
Rakvere-Kunda 110 kV overhead line reconstruction Installation of bird protections and tower hats – 108 towers 2016 Elering
Kallavere-Kuusalu 110 kV overhead line reconstruction Exchange of old tower beams and insulator sets, clamping of conductors – 87 towers 2016 Elering
Petäjäskoski-Pyhänselka 400 kV overhead line OPGW installation – 25 km 2016 Fingrid
Valgu-Vigala 110 kV overhead line reconstruction Exchange of old insulator sets – 81 towers 2016 Elering
110 kV arrangements in Varkaus substation Reconstruction of 6x 110 kV lines: erection of towers, conductor-shield wire-OPGW stringing works 2016 Fingrid
Tuovila-Hirvisuo 400 kV overhead line OPGW installation – 51 km 2016 Fingrid